{"id":2677,"date":"2022-07-16T17:25:21","date_gmt":"2022-07-16T17:25:21","guid":{"rendered":"https:\/\/mcw663.com\/?p=2677"},"modified":"2022-07-23T02:29:41","modified_gmt":"2022-07-23T02:29:41","slug":"quy-trinh-thu-ap-duong-ong-cap-nuoc","status":"publish","type":"post","link":"https:\/\/mcw663.com\/en\/quy-trinh-thu-ap-duong-ong-cap-nuoc\/","title":{"rendered":"Pressure testing process of water supply pipes according to the latest standards"},"content":{"rendered":"
The <\/span>pressure test of the water supply pipe<\/span><\/strong> according to the standard is a very important step in plumbing works, it ensures safety and longevity when using the system. The acceptance of the internal water supply system and the hot water supply system shall be conducted only after the pipe pressure test results are available. Let’s find out with MCW Company the pressure test process of water supply pipes in the following article.<\/span><\/p>\n