{"id":2020,"date":"2022-04-30T11:20:26","date_gmt":"2022-04-30T11:20:26","guid":{"rendered":"https:\/\/mcw663.com\/?p=2020"},"modified":"2022-06-04T03:52:02","modified_gmt":"2022-06-04T03:52:02","slug":"quy-trinh-thu-ap-he-thong-ong-gas-dieu-hoa","status":"publish","type":"post","link":"https:\/\/mcw663.com\/en\/quy-trinh-thu-ap-he-thong-ong-gas-dieu-hoa\/","title":{"rendered":"Pressure test process for air conditioning gas pipe system according tp technical standards from A-Z"},"content":{"rendered":"
After completing the install of the gas pipeline system (the end of the pipe has been sealed at eh indoor unit), conduct a pressure test of the air-conditioning gas pipe system in the floor of the contractor allows the ceiling to be closed. Carry out the construction of the claim gas pipeline to the out door if the conditions permit. Try applying pressure again when you have caught all the zacco of the indoor unit and connected all the gas pipes to the outdoor unit. In order for the pressure test process of the air conditioning gas pipe system to take place successfully. Please refer to the following article with MCW!<\/p>\n